Project Planning Checklist
This section outlines the steps required to complete the purchase order, pre-installation worksheet, and IT worksheet. As you complete projects over time, you can refine the checklists and create additional worksheets to suit your needs.
Completing the Purchase Order
□ | If this is your first installation, create a ticket at support.digitallumens.com requesting guidance from a Digital Lumens Application Engineer. |
□ | Complete a walk-through of the facility to determine the following:
|
□ | Obtain a CAD file of the facility floor plan. |
□ | Determine the facility footcandle/lux requirements. |
□ |
Use IES files available from support.digitallumens.com to run a photometric simulation based on the facility's lux/footcandle requirements. A photometric simulation will give you the ability to make accurate recommendations for fixture type, fixture quantity, mounting height, and spacing. |
□ | Edit the CAD file floor plan: Add a symbol representing each fixture. |
□ | Determine the delivery date. |
Completing the Pre-Installation and IT Worksheets
□ | Complete and send a copy of the Pre-installation Worksheet to the facility IT manager. |
□ | Work with the facility to complete the IT Worksheet. |
□ | Determine the required quantity of lighting gateways:
|
□ | Determine the required quantity and type of PoE switches:
|
□ | Identify a secure room suitable location for the LightRules Appliance (LRA). |
□ | Edit the CAD file floor plan: Add a symbol representing the LRA, each lighting gateway, and each switch. |